Equipment Status
Project Equipment Status Summary
|
Sys |
Name |
Physical |
Electrical |
Control |
Loop-Check |
|
|
|
|
|
|
|
|
6 |
Munition Queuing System |
Offline |
Offline |
Offline |
Offline |
|
7 |
Fixture Transfer System |
Offline |
Offline |
Offline |
Offline |
|
12 |
Fixtures/Fixture Drying |
Complete |
Complete |
Complete |
Complete |
|
13 |
Munition Transport System |
Complete |
Complete |
Complete |
Complete |
|
14 |
Cryobath |
Complete |
Complete |
Complete |
Complete |
|
15 |
Press Munition Loader Robot |
Complete |
Complete |
Complete |
Compete |
|
16 |
Cryofracture Press |
Complete |
Complete |
Complete |
Complete |
|
17 |
Debris Discharge |
Complete |
Complete |
Complete |
Complete |
|
18 |
Debris Separation System |
Complete |
Complete |
Complete |
Complete |
|
19 |
In-process Deactivation |
Complete |
Complete |
Complete |
Complete |
|
22 |
Drum and Packaging System |
Complete |
Complete |
Complete |
Complete |
|
24 |
Debris Transport System |
Complete |
Complete |
Complete |
Complete |
|
27 |
Positive Feed System |
Complete |
Complete |
Complete |
Complete |
|
31 |
Electrical Distribution |
Complete |
Complete |
Complete |
Complete |
|
|
Diesel Generator |
Complete |
Complete |
Complete |
Complete |
|
32 |
Process Air |
Complete |
Complete |
Complete |
Complete |
|
35 |
Dust and Emission Collection |
Complete |
Complete |
Complete |
Complete |
|
40 |
Control System |
Complete |
Complete |
Complete |
Complete |
|
|
Control Room |
Complete |
Complete |
Complete |
Complete |
|
|
CCTV System |
Complete |
Complete |
Complete |
Complete |
|
|
APE-1236 RKS Integration |
Complete |
Complete |
Complete |
Complete |
|
|
Detonation Detection System |
Complete |
Complete |
Complete |
Complete |
|
45 |
Hardwired Protection System |
Complete |
Complete |
Complete |
Complete |
Plant Operational Status
|
Mode |
Name |
Tested Cryo |
Tested PDWC |
|
|
|
|
|
|
0 |
Initialization |
Tested |
Not required |
|
1 |
Reset |
Tested |
Not required |
|
2 |
Startup |
Tested |
Not required |
|
3 |
Automatic Operations |
Tested |
Not required |
|
7 |
Terminate Operations |
Tested |
Not required |
|
8 |
Emergency Stop |
Tested |
Not required |
|
10 |
Run full drums out |
Tested |
Not required |
|
11 |
Run shuttle boxes out |
Tested |
Not required |
|
20 |
Control System Shutdown |
Tested |
Not required |
|
21 |
Control System Termination |
Tested |
Not required |
|
|
|
|
|
|
- - - - |
Hold/Continue |
Tested |
Not required |
|
- - - - |
Repeat PFS Operation |
Retest |
Not required |
|
- - - - |
Dump all 8 shuttle boxes |
Tested |
Not required |
|
- - - - |
Move 7 shuttle boxes |
Retest |
Not required |
|
- - - - |
LN2 fast Fill |
Retest |
Not required |
|
- - - - |
Pre soak operations |
Retest |
Not required |
|
|
|
|
|
|
- - - - |
Kill processors |
Retest |
Not required |
Robot Download Equipment Status
|
Sys |
Name |
Physical |
Electrical |
Control |
Loop-Check |
|
|
|
|
|
|
|
|
2 |
HPU |
Offline |
Offline |
Offline |
Offline |
|
|
HPU Piping |
Offline |
Offline |
Offline |
Offline |
|
|
Projectile Handling System |
Offline |
Offline |
Offline |
Offline |
|
|
Projectile Input Station |
Offline |
Offline |
Offline |
Offline |
|
|
Projectile Handling Robot |
Offline |
Offline |
Offline |
Offline |
|
|
Cryobath Station |
Offline |
Offline |
Offline |
Offline |
|
|
Ogive/Base Plate Removal |
Offline |
Offline |
Offline |
Offline |
|
|
Projectile Holding Station |
Offline |
Offline |
Offline |
Offline |
|
|
Rework Station |
Offline |
Offline |
Offline |
Offline |
|
|
Tooling Storage Station |
Offline |
Offline |
Offline |
Offline |
|
|
Munition Transfer Conveyor |
Offline |
Offline |
Offline |
Offline |
|
3 |
Munition Handling System |
Offline |
Offline |
Offline |
Offline |
|
|
Mine Handling Robot #1 |
Offline |
Offline |
Offline |
Offline |
|
|
Mine Handling Robot #2 |
Offline |
Offline |
Offline |
Offline |
|
|
Mine Processing Station |
Offline |
Offline |
Offline |
Offline |
Munitions Processed
|
Munition Item |
Processed |
Total |
Date |
Comments |
|
|
|
|
|
|
|
ADAM QA |
110 |
110 |
Oct 4 |
Process startup – small changes required |
|
ADAM QA |
182 |
292 |
Oct 16 |
Process operations – small changes required |
|
ADAM QA |
783 |
1075 |
Oct 17 |
Process operations – good run |
|
ADAM QA |
303 |
1378 |
Oct 18 |
Process operations – small fixes |
|
ADAM QA |
1286 |
2664 |
Oct 19 |
Process operations – good run with changes required |
|
ADAM QA |
54 |
2718 |
Oct 24 |
Process operations – not the best run with some equipment modifications required |
|
None |
0 |
0 |
Nov 6 |
Run in air – good run |
|
None |
0 |
0 |
Nov 7 2007 |
Run in air – ready to transition to ADAM QA but problems with tilt table |
|
None |
0 |
0 |
Nov 8 2007 |
Processed drum 1 out of 16 |
|
None |
0 |
0 |
Nov 9 2007 |
Processed drum 2, 3, & part of 4 out of 16 |
|
ADAM QA |
306 |
3024 |
Nov 26 2007 |
Process operations – good run with ADAM QA |
|
ADAM QA |
210 |
3234 |
Nov 27 2007 |
Process operations – good run with ADAM QA until induction heater system failure |
|
ADAM QA |
915 |
4149 |
Jan 8 2008 |
Excellent run with ADAM QA Mines |
|
ADAM QA |
600 |
4749 |
Jan 9 2008 |
Excellent run with ADAM QA Mines |
|
ADAM QA |
1200 |
5949 |
Jan 10 2008 |
Excellent run with ADAM QA Mines |
|
ADAM QA |
540 |
6489 |
Mar 13 2008 |
Excellent run with ADAM QA Mines |
|
|
|
|
|
|
|
ADAM AP |
1 |
1 |
Mar 13 2008 |
Excellent run with one ADAM AP Mine |
|
ADAM AP |
45 |
46 |
Mar 17 2008 |
Excellent run with ADAM AP Mines |
|
ADAM AP |
112 |
158 |
Mar 19 2008 |
Excellent run with ADAM AP Mines |
|
ADAM AP |
606 |
764 |
Mar 26 2008 |
Good run with ADAM AP Mines – one event |
|
ADAM AP |
1026 |
1790 |
Mar 29 2008 |
Good run with ADAM AP Mines – one event |
|
ADAM QA |
460 |
|
June 9 2009 |
Good run |
|
ADAM QA |
419 |
|
June 10 2009 |
Good run |
|
ADAM AP |
72 |
|
June 10 2009 |
Good run |
|
ADAM AP |
827 |
899 |
June 11 2009 |
Good run – tilt table problem |
|
ADAM AP |
888 |
1787 |
June 12 2009 |
Excellent Run |
|
ADAM AP |
1,235 |
3022 |
July 21 2009 |
Excellent Run |
|
ADAM AP |
354 |
3375 |
July 22 2009 |
Valve malfunctioned after one event |