     The Projectile Download Workcell is an automated system to remove (download) ADAM mines from 155mm projectiles and supply six ADAM mines at a time to the cryofracture system for demilitiarization.

 

     The system comprises the following items:

 

a)      Projectile Handling System (PHS) – the robot and equipment to download the ADAM mines from the 155mm projectiles

 

 

PHS Fanuc Robot                                    PHS Tool Rack

 

 

 

Nose Cutter and Base Removal                   PHS Robot with Nose Cutter

 

PHS with ADAM Mine pushout machine

 

 

b)      Munition Handling System (MHS) – the two robots and equipment to take the singularized mines from the PHS and load them onto the transport fixtures.

 

 

MHS Robots (left and right hand robots)

 

 

Empty Transport Fixtures for mine loading         Singularized ADAM AP mines               

  

MHS Robot loads mines onto Transport Fixtures

 

 

 

MHS Robot with ADAM conveyors

 


 

c)      Munition Queuing System (MQS) – The Munition Queuing System is used to transport empty fixtures to the MHS from the Fixture Transfer System (FTS) and remove full fixtures containing ADAM mines from the MHS to the FTS.

 

 

 

MQS System interfaced with MHS          MQS System under the Mezzanine

 

 

MQS System with area reserved for future MHS equipment

 

 

MQS System is quite long

 

MQS with empty Transport Fixtures

 

 


 

 

d)      FTS – The Fixture Transport System is used to feed the MQS with empty fixtures and feed the cryofracture system with full fixtures.

 

 

Installation of the FTS                                         FTS and MQS interface

 

MQS and FTS Interface (Note transport fixture at load/unload point)

 

 

Fixture Load/Unload point                            Fixture pickup at load point by FTS

 

 

 

e)      Munition Transport System (MTS) Conveyor Stabilizer – The MTS conveyor stabilizer allows a stable transport fixture pickup/dropoff point for the FTS.

 

 

Installation of the MTS Stabilizer                 MTS Stablizer with FTS and fixture

 

 

f)       Safety Systems – The PDWC utilizes personnel exclusion safety barriers for protection.

 

 

Safety Barrier to keep people out of workcell


 

g)      HPU – The Hydraulic Power Unit supplies high-pressure hydraulic pressure to Cell #1 and Cell #2 for projectile body clamping and ADAM mine extraction.

 

 

             HPU                                                                Inlet vent                     

 

 

 

HPU Supply pipes terminating at interface point for PHS

 

 

 

 

 

 

h)      Mezzanine – The mezzanine is where the robot controllers and other automated PDWC control system components are located. 

 

 

 

 

i)        Additional Equipment – There is area under the mezzanine that is serviced by the conveyor that will allow additional robot cells to be implemented at a future date.